New Rosebud-Lott Elementary School

Civil Engineer – Walker Partners

General Contractor – John Erwin Construction

Scope of Work – Site SWPPP. Site excavation, import site fill material, prep subgrade, lime stabilization, top soil and final grading. Install concrete curb and gutter, valleys and drainage flumes. Install cement treated base and asphalt paving in parking lot and drives. Install RCP culvert at highway entrance. Install domestic water system and fire riser. Install sanitary sewer system and manholes.