Team

Team 2018-07-12T17:00:15+00:00

Mike Barnett

President

Mike is Barnett’s CEO and general manager. He is active in all phases of the business with a focus on estimating, cost control, and office management. He also oversees public relations, equipment acquisition, and maintenance, materials management, and is our general troubleshooter/ Mike has thirty-five years of continuous experience in all aspects of this business.

Patrick Barnett

Vice-President

As vice-president, Patrick acts as general superintendent for all projects. He supervises all field personnel, daily equipment distribution, materials purchasing, and sets and/or checks all grading dimensions for accuracy and compliance. Patrick is proficient with AutoCAD, Softdesk, and all surveying instruments as well as laser machine grade and slope control. He has twenty-eight of experience handling earth work, concrete and asphalt projects. Patrick has also been certified to install segmental block retaining walls on many projects

Scott Barnett

Vice president

Scott rejoined Barnett Contracting in 2003 after graduating from the University of North Texas and then an eighteen year career in public education. Scott holds an underground fire certification (RME-U-1726) and has completed OSHA safety course 510. Scott leads the safety program, assists with estimating, is trained in the “Paydirt” takeoff program, coordinates staff planning meetings and serves as project manager.

Anthony Tomchesson

Professional Engineer

Tony studied civil engineering at Texas A&M University. Tony has twenty-four years construction experience which includes twenty years design experience with the Wallace group and Barnett Contracting Inc. He oversees the mechanics shop, survey crew, quality control, and all aspects of design and engineering. Duties and responsibilities include performing all engineering calculations and design computations necessary for the preparation and completion of construction plans for land development projects and drainage projects. An average set of construction documents for his projects include an overall drainage area map with drainage calculations, a site grading and drainage plan, storm sewer design, water and waste water plans, and detail sheets depicting project-specific details necessary for construction. Duties also include regular site inspections and cost analysis.

Want to work with us?

Visit our career board for our current job opportunities.
View Careers